Quick Facts
FONT-SIZE Plus   Neg
Share SHARE

ANDRITZ Bags Order For Rehabilitation Of Inga 2 Hydropower Plant - Quick Facts

ANDRITZ AG (ADRZF.PK) said it received a contract for reconstruction and rehabilitation of two Francis units for the Inga 2 hydropower plant, DR Congo. The contract value of the project is around 45 million euros. Commissioning is scheduled for 2015.

As part of a consortium, ANDRITZ HYDRO is responsible for the entire mechanical part of the rehabilitation including the repair and overhaul of the penstocks, the hydraulic steelworks and the two Francis turbines.

ANDRITZ noted that in order to achieve high efficiency with optimum performance, high reliability and low maintenance requirements, all core parts of the turbines with runner diameters of 6.2 m will be newly designed and replaced by modern, robust equipment.

Click here to receive FREE breaking news email alerts for Andritz AG and others in your portfolio

by RTT Staff Writer

For comments and feedback: editorial@rttnews.com

Business News

Quick Facts

Editors Pick
Stocks came under pressure in early trading on Friday and remained firmly in the red throughout the remainder of the trading session. With the losses on the day, the S&P 500 pulled back well off yesterday's record closing high. President Barack Obama is meeting with presidents from Central American nations on Friday as the U.S. struggles to deal with a surge of unaccompanied children across the southern border. Despite calls from some leading conservatives, the results of a new CNN/ORC International poll released Friday showed that a vast majority of Americans do not believe that President Barack Obama should be impeached and removed from office.
comments powered by Disqus
FREE Newsletters, Analysis & Alerts

 

Stay informed with our FREE daily Newsletters and real-time breaking News Alerts. Sign up to receive the latest information on business news, health, technology, biotech, market analysis, currency trading and more.