logo
Share SHARE
FONT-SIZE Plus   Neg

ANDRITZ Bags Order For Rehabilitation Of Inga 2 Hydropower Plant - Quick Facts

ANDRITZ AG (ADRZF.PK) said it received a contract for reconstruction and rehabilitation of two Francis units for the Inga 2 hydropower plant, DR Congo. The contract value of the project is around 45 million euros. Commissioning is scheduled for 2015.

As part of a consortium, ANDRITZ HYDRO is responsible for the entire mechanical part of the rehabilitation including the repair and overhaul of the penstocks, the hydraulic steelworks and the two Francis turbines.

ANDRITZ noted that in order to achieve high efficiency with optimum performance, high reliability and low maintenance requirements, all core parts of the turbines with runner diameters of 6.2 m will be newly designed and replaced by modern, robust equipment.

by RTT Staff Writer

For comments and feedback: editorial@rttnews.com

Business News

Quick Facts

Editors Pick
Even after two years of thoroughly searching across the Indian Ocean, using modern technologies and devices, there is no clue about the Malaysian airline that vanished on March 8, 2014. Internet access is growing worldwide, but there is still a long way to go before the entire world is completely wired, a study from the Pew Research Center has found. The study also noted that men have greater access to the Internet than women in many nations. Backtracking on its early announcements on digital privacy, WhatsApp is planning to share member information, phone numbers and analytical data with Facebook, to make revenue from the platform.
comments powered by Disqus
Follow RTT